Data Centre / capability
AI-Ready and High-Performance Infrastructure
A single GPU node can draw more than the cabinet was designed to deliver. Weight, kilowatts, air path and liquid readiness are checked before you order.
The rack holding your current servers cannot hold a GPU node. That is a floor, power and cooling question, not an AI question.
Weight per rack, kilowatts per rack, the air path, and whether the room could ever take liquid. Those four decide what you can install and none of them appear on the quotation. The kit arrives in weeks. Power and cooling changes take quarters.
Get SECCOM to check what your real floor, power and cooling will take, before anything is ordered.
What you get. A per-rack statement of weight, power and thermal capacity measured against the node you are actually considering, and the smallest configuration that will run your first workload rather than one that anticipates your tenth.
Where SECCOM stops. Whether a model earns its cost is the workload owner's question. SECCOM sizes and builds what it runs on, and will say plainly when renting GPU hours is the cheaper answer for the next twelve months.