Data Centre / capability
Edge and Distributed Data Centres
Edge failures are rarely difficult, they are far away. Each site is mapped against travel time, the on-site skill available and the spare held locally.
The rack in the plant room has no raised floor, no chiller and nobody on site who can reseat a drive.
Edge failures are rarely difficult. They are far away. What decides whether a site is down for two hours or two days is travel time, whether a spare is already there, and whether the first person to reach it is allowed to touch it. A plant in a tier-3 district is a flight and then a four-hour drive.
Arrange SECCOM to map your real site list against travel time and local spares, at no cost.
What you get. A list of every site with its travel time, the skill available on site and the spare held locally, plus one standard build repeated everywhere so a field engineer can swap a unit without a site-specific briefing.
Where SECCOM stops. SECCOM standardises the build and holds the spares. Site access, physical security and the local power supply stay with the site owner.