AV & Collaboration / capability
Auditoriums, Convention Halls and Venues
An auditorium is signed off with forty people in it and used with four hundred. Coverage is predicted from drawings, then measured in the room as built.
An auditorium is signed off with forty people in it and used with four hundred.
A full hall is a different acoustic space from an empty one. The seats absorb, the crowd absorbs, and coverage that measured evenly at handover no longer does. That is why a prediction made before purchase is worth more than a demonstration made after.
Kramer and Q-SYS both build the signal management and control platforms a hall this size switches through, and SECCOM specifies against whichever one fits the building.
Ask SECCOM to model your real room and predict coverage before a single loudspeaker is selected. The model also tells you what the interior finishes have to achieve, while they can still be changed.
What you get. A predicted coverage map, a measured result at sample seats after install, and a commissioning report that puts the two side by side. Where they differ, SECCOM says why.
Where SECCOM stops. Civil works and interior finishes drive the acoustics of a hall. SECCOM states what the finish has to achieve. The architect decides how to achieve it.