SEC Communications - Integrating Customers With TechnologyEngage

Command Centre / capability

Traffic and Transit Control Centres

How many junctions one operator can hold at the peak is the constraint, and it is smaller than most tenders assume. Observed on the floor, at full occupancy.

Most traffic control rooms are still driven by fixed-time plans and inductive loops buried in the road.

Those loops were laid decades ago and they fail quietly. On the wall, a junction running on a plan written for traffic that no longer exists looks identical to one that is working. The room gets rebuilt long before anybody audits what it is actually controlling.

Where SECCOM stops. The adaptive control system, the signal plans and the road network belong to the traffic authority and its supplier. SECCOM builds the room around them. Where the outcome being bought is the corridor moving better rather than the room itself, that is SECCOM's Smart Infrastructure practice.

Next step

Planning work in this area, or living with something that no longer fits?